Re: Linesville Launch
2016/09/06 09:11:23
(permalink)
Gravey, apparently progress has slowed. Driving the pilings has slowed because the contractor is struggling to keep his barge from grounding. The lake is down 20" below normal pool. I sent an email to my guy to asking about the barge grounding because I thought part of the reno was to dredge the marina, which I thought they would do first, before driving the pilings. Waiting for a response. If I hear more, I will post here
"Fair winds and following seas..."